Scada and communication verification
Updated 2026-10-13
Data records
- SCADA and Communication Verification is specified for microprocessor-based protective relays in acceptance testing at clause 7.9.2.B.10 of ANSI/NETA ATS-2025. Value: microprocessor-based protective relays.
- SCADA and Communication Verification is specified for microprocessor-based protective relays in maintenance testing at clause 7.9.2.B.5.8 of ANSI/NETA MTS-2023. Value: microprocessor-based protective relays.
Elsewhere in the family
- SCADA and Communication Verification more on this entry on Electrical Testing Reference
- Meter Accuracy Verification related entry on Revenue Metering Reference
- PV I-V Curve Tracing related entry on Electrical Testing Reference
- PV String Voc and Isc related entry on Electrical Testing Reference
- PV Wet Insulation Resistance related entry on Electrical Testing Reference
- Arc Energy Reduction Performance related entry on Electrical Testing Reference
- System Function Testing related entry on Electrical Testing Reference
- System function testing related entry on Switchgear Testing Reference
- ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications related entry on Electrical Testing Reference
- ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications related entry on Electrical Testing Reference
- IEEE Standard for Interconnection and Interoperability of Inverter-Based Resources (IBRs) Interconnecting with Associated Transmission Electric Power Systems related entry on Interconnection Reference
Sources
- ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.9.2.B.10. Held as: Purchased single-user copy. Publisher page
- ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.9.2.B.5.8. Held as: Purchased single-user copy. Publisher page
Obtaining the documents
- ANSI/NETA ATS-2025: publisher catalog or sales page
- ANSI/NETA MTS-2023: publisher catalog or sales page
Changelog (2 entries)
| Date | Revision | Change |
|---|---|---|
| 2026-10-13 | created (tests.scada-and-communication-verification.equipment.relay.acceptance) | |
| 2026-10-13 | created (tests.scada-and-communication-verification.equipment.relay.maintenance) |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Scada and communication verification." Protective Relay Reference. 2026-10-13. https://www.protectiverelayreference.com/tests/scada-and-communication-verification/.
Protective Relay Reference, Scada and communication verification (Oct. 13, 2026), https://www.protectiverelayreference.com/tests/scada-and-communication-verification/.
@misc{etr-tests-scada-and-communication-verification,
title = {Scada and communication verification},
howpublished = {\url{https://www.protectiverelayreference.com/tests/scada-and-communication-verification/}},
organization = {Protective Relay Reference},
publisher = {Protective Relay Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=Scada and communication verification |website=Protective Relay Reference |publisher=Protective Relay Reference |url=https://www.protectiverelayreference.com/tests/scada-and-communication-verification/ |date=2026-10-13 |access-date=}}