Data record tests.protective-relay-element-tests.ieee1547-1.poc-unit-verification

Verified 2026-10-24 Confidence: High

Table 72 of IEEE 1547.1-2020 shows that, for a fully compliant PoC unit, the mandatory voltage tripping requirement of IEEE 1547-2018 is verified through the design evaluations and the applied-settings read-back rather than through a field trip test, while a field frequency trip test depends on the outcome of the design evaluation.

ProvenanceIEEE 1547.1-2020 supports data record tests.protective-relay-element-tests.ieee1547-1.poc-unit-verification, which is cited on the entry Protective Relay Element Tests.SOURCEIEEE 1547.1-2020IEEE 1547.1-2020Licensed standard, clause Table 72DATA RECORDtests.protective-relay-element-tests.ieee1547-1.poc-unit-verificationtests.protective-relay-e..Verified 2026-10-24ENTRYProtective Relay Element TestsProtective Relay Element..No revisions
Provenance. Where this record comes from and where it is used: the cited source, the record itself and the entry that cites it.
Provenance: the chain from source to entry.
StepItemDetail
SourceIEEE 1547.1-2020Licensed standard, clause Table 72
Data recordtests.protective-relay-element-tests.ieee1547-1.poc-unit-verificationVerified 2026-10-24
EntryProtective Relay Element TestsNo revisions
Subject
Protective Relay Element Tests (Test methods)
Kind
Method fact
Source
IEEE 1547.1-2020, clause Table 72, Conformance Test Procedures for Equipment Interconnecting Distributed Energy Resources, IEEE.

History

Every recorded change to this data record, oldest first.
DateChange
2026-10-24created
2026-10-24review_status unreviewed -> software_reviewed

Cite this page

Cite the governing standard for the fact itself; cite this page as the finding aid.

"Data record tests.protective-relay-element-tests.ieee1547-1.poc-unit-verification." Protective Relay Reference. 2026-10-24. https://www.protectiverelayreference.com/data/tests.protective-relay-element-tests.ieee1547-1.poc-unit-verification/.